Cisco NCS 2006 Hardware Installation Manual page 255

Ncs 2000 series
Table of Contents

Advertisement

Connecting and Routing the Cables
of ECU cable is required in the left exit area to manage the USB connections (see Diagram 2 of the figure
below ).
Figure 131: Cable Management
Step 2
Fix the cables using the tie-wrap provided in the accessories kit.
Step 3
To route the optical patch cords or copper cables, do the following as necessary:
a) Route the optical patch cords from the line cards through the fiber or cable module as shown in the figure
below .
Figure 132: Cable Routing
DLP-L25 Routing and Locking Cables
Cisco NCS 2000 Series Hardware Installation Guide
227

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ncs 2002Ncs 201

Table of Contents