18/60
Assembly
The lift transverse unit
comes installed in a
conveyor unit.
• Connect the lift transverse
unit with the ST 5/...
conveyor unit, the
AS 5/... drive unit, the
CU 5/... curve, the DI 5/...
diverter and the JU 5/...
junction. See the assembly
instructions for these
components.
• See page 21 for
installing the VE 5/...
stop gates.
• See page 24 for
installing the DA 5/...
damper.
Please note:
Depending on the length of
the workpiece pallet (lWT)
and the roller pattern (p),
the HQ 5 lift transverse unit
is installed at a predefi ned
distance from a roller
axle. This gives rise to the
mounting dimensions for
the VE 5/... stop gate and
DA 5/... damper.
The reference points for
the installation are (in the
transport direction):
• Trailing edge of the roller
bearing pedestal before
HQ (1)
• Leading edge of the roller
bearing pedestal after
HQ (2)
Bosch Rexroth AG, MIT: HQ 5/H, HQ 5/XH, 3 842 558 544/2017-07
7.5 Installing the product
7.5.1
Mounting dimensions
B
1
1
B
+
1
Fig. 4:
HQ 5 lift transverse unit mounting dimensions
A
2
2
E
D
C
A
–
–
+
2
G
F
J
H
2
2
E
D
G
A
G
F
2
557 617-05