Assembly; Unpacking; Installation Requirements; Installation Position - Bosch Rexroth HQ 5/H Assembly Instructions Manual

Table of Contents

Advertisement

16/60

Assembly

1
2
Bosch Rexroth AG, MIT: HQ 5/H, HQ 5/XH, 3 842 558 544/2017-07
7 Assembly

7.1 Unpacking

Lift the product out of its packaging.
Use a lift aid to lift the product. The lifting lugs of the conveyor unit can be used
as lifting points for a round sling, for example.
Dispose of the packaging material in accordance with the applicable regulations
in your country.

7.2 Installation requirements

During installation, be sure to maintain the ambient conditions specifi ed in the
Technical Data (see page 53).
7.2.1

Installation position

Install the product level and plumb, at right angles, and axially parallel. This
ensures proper functioning and prevents premature wear.
7.2.2

Fastening with T-bolts

• Fasten the TS 1, TS 2plus, TS 2pv, TS 4plus and TS 5 transfer systems, and the
VarioFlow and VarioFlow S chain conveyor systems with T-bolts and fl ange nuts.
• Make sure the T-bolt is in the correct position when inserting into the slot and
tightening. The notch at the head of the bolt indicates the orientation of the T-bolt.
1 = T-bolt insertion position in the slot.
2 = T-bolt clamping position in the slot.
Tightening torque: 25 Nm (M8).

7.3 Required tools

• Hex wrench SW13.
• Hex socket wrenches SW3, SW4, SW5, SW6.
• Cross recess screwdriver PZ2
• Rubber mallet
• Spirit level

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rexroth hq 5/xh

Table of Contents