Huawei USG6000E Series Hardware Manual page 524

Hide thumbs Also See for USG6000E Series:
Table of Contents

Advertisement

HUAWEI USG6000E Series
Hardware Guide
Precautions
Before unpacking the carton, ensure that the packing carton is intact and not
damaged or soaked. Stop unpacking if the USG is rusted or soggy. Then,
investigate causes and contact the supplier.
Tools and Accessories
Procedure
Step 1 Fix mounting ears to both sides of the panel with ports using M4 screws.
Figure 5-7 Installing the mounting ears on the chassis
Step 2 Determine the locations of four mounting holes on the wall using a ruler and
mark the mounting holes with a marker.
Issue 08 (2022-04-20)
Ruler
Marker
Hammer drill
Vacuum cleaner
Hammer
Phillips screwdriver
Mounting ears and matching screw (purchased separately, BOM numbers:
21240477)
NO TE
● The wall must be a bearing wall. Otherwise, the wall is not suitable for wall-mounting.
● Ensure that the height of mounting holes is proper so that the indicators are easy to
view.
Copyright © Huawei Technologies Co., Ltd.
5 Hardware Installation
517

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents