Table 5-1 Installation environment checklist
Check Item
Ventilation and heat
dissipation
Stability
Grounding
Temperature
Relative humidity
Cleanness
Electrostatic discharging
Surge protection
Power supply facility
Electromagnetic
shielding
5.2.3 Instruments Required for the Installation
This section describes the instruments and meters for installing the USG.
Table 5-2
Table 5-2 Required instruments and meters
Category
Measuring and
lineation
instruments
Fastening tools
Issue 08 (2022-04-20)
Requirement
Complies with
requirements in
Position.
Complies with
requirements in
Humidity, Temperature,
and
Complies with
requirements in
Requirements.
Complies with
requirements in
Lightning Protection
and
Complies with
requirements in
Supply.
Complies with
requirements in
Electromagnetic
Protection.
lists the required instruments and meters for USG installation.
Instrument/Meter
● Ruler: used to measure length.
● Marker: used to indicate specific lengths with drawn
lines.
● Flat-head screwdriver: used to fasten small screws and
bolts.
● Phillips screwdriver: used to fasten small screws and
bolts.
Copyright © Huawei Technologies Co., Ltd.
Device
Cleanness.
ESD
Grounding.
Power
5 Hardware Installation
Compliance
□ Y □ N □ N/A
□ Y □ N □ N/A
□ Y □ N □ N/A
□ Y □ N □ N/A
□ Y □ N □ N/A
□ Y □ N □ N/A
□ Y □ N □ N/A
□ Y □ N □ N/A
□ Y □ N □ N/A
□ Y □ N □ N/A