Installation; Unpacking The Product; Installation Conditions; Installation Position - Bosch Rexroth HD 2/H Assembly Instructions Manual

Lift-rotate unit
Table of Contents

Advertisement

1
2

7 Installation

7.1 Unpacking the product

Lift the product from its packaging.
Use a lifting aid to lift the product. For example, the eye bolts (X) in the base
plate serve as lifting points for a round sling (see e.g. Fig. 6 on page 19)
Dispose of the packaging material in accordance with the national laws of your
country.

7.2 Installation conditions

During installation the ambient conditions specifi ed in the technical data
(see page 54) must be maintained.
7.2.1

Installation position

Install the product at right angles and parallel to the axis. This ensures proper
functioning and prevents premature wear and tear.
7.2.2

Fixing with T-head bolts

• Mount the transfer systems TS 1, TS 2plus, TS 2pv, TS 4plus, TS 5 and the chain
conveyor systems VarioFlow and VarioFlow S with T-head bolt and collar nut.
• When inserting and tightening, make sure the T-head is in the correct position
in the collar nut. The notch at the end of the screw indicates the position of the
T-head.
1 = insertion position of the T-head bolt into the slot
2 = clamping position of the T-head bolt into the nut
Tightening torque 25 Nm (M8).

7.3 Required tools

• Hex head cap screw SW14
• Hex socket head cap screw SW3, SW4, SW5, SW6.
• Cross recess screwdriver PZ2
• Rubber mallet
• Spirit level
Installation
3 842 358 796/2015-01, MIT: HD 2/H, Bosch Rexroth AG
17/56

Advertisement

Table of Contents
loading

This manual is also suitable for:

3 842 998 7603 842 998 7613 842 998 762

Table of Contents