Mitsubishi Electric MELSEC Q Series User Manual page 60

Hide thumbs Also See for MELSEC Q Series:
Table of Contents

Advertisement

Check field
System power-on
Power on after check that:
• power supply wiring is properly arranged.
• power supply voltage is within the operational range.
Parameter setting
Create a parameter.
• Install Setting/monitoring tools for the C Controller module to the
development environment (Personal computer).
• Set the parameters by Setting/monitoring tools for the C Controller
module.
• Connect the C Controller module and the development environment
(Personal computer).
(Use USB2 or S CH1. After initialization, the IP address is reset to the
default. To connect via the Ethernet, use the default IP address.)
• Write the parameters to the C Controller module.
C Controller system reset
Set the RUN/STOP/MODE switch on the C Controller module to RUN.
Reset the C Controller system.
Error check
Check for any error indicated by the C Controller module LEDs.
Perform troubleshooting if any error is present.
If any error is present in other than the C Controller module, refer to and
follow the manual for respective module(s) to perform troubleshooting.
Installation of partner operating system
Install a partner operating system to this product.
User program creation
Refer to the manual of the partner operating system, or consult the
partner (operating system vendor).
58
From the previous page
Operation
$QCPU User's Manual
(Hardware Design, Maintenance and Inspection)
 Page 288, CHAPTER 15
 Page 111, Section 7.6.5
 Page 129, Section 8.7.2 (3)
$Setting/Monitoring Tools for the C Controller
Module Version 4 Operating Manual
 Page 71, Section 6.3
 Page 394, CHAPTER 23
$Manual for respective module
 Page 59, Section 5.3.1

Advertisement

Table of Contents
loading

Table of Contents