Operation; Switch-On/Switch-Off; Preparation For Testing; Cleaning Instructions For Cri/Crin, Cri Piezo And Dhk/Ui - Bosch 1 687 010 398 Original Instructions Manual

Extension set for bosch commercial vehicle injectors with injector clamping and injection chamber
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 18
4.

Operation

4.1
Switch­on/switch­off
!
Do not switch off the EPS 200 while component test-
ing is in progress (except in the case of emergency
stop). Always switch off the EPS 200 by way of the
central master switch on the front of the unit before
unplugging the three-phase AC connector.
Switch on the EPS 200 with the central master
switch on the front of the unit.
 After switch-on, the Windows operating system
starts up and then the EPS 200 system software.
Before switching off at the central master switch,
first end the EPS 200 system software and then shut
down the Windows operating system.
i
Prior to renewed switch-on, the EPS 200 must have
been switched off for at least 60 seconds.
4.2

Preparation for testing

R
Before performing any CRI/CRIN, CRI Piezo or DHK/
UI tests, always check the oil level indicator to make
sure there is sufficient test oil in the tank.
!
The test oil level must always be above the inspec-
tion port mark.
R
We recommend performing a leak test every day
(sealing plug on connection adapter). The leak test
can be called up under "Service >> Equipment
diagnosis".
R
To avoid contamination of the test oil, each
CRI/CRIN, CRI Piezo and DHK/UI component must
be cleaned before testing. Never fit damaged, con-
taminated and/or severely corroded CRI/CRIN, CRI
Piezo and DHK/UI for testing.
Robert Bosch GmbH
Operation | 1 687 010 398 | 27
4.3
Cleaning instructions for CRI/CRIN,
CRI Piezo and DHK/UI
!
Do not clean the nozzle cone with a brass brush,
steel brush or the like as this would damage the in-
jection orifices. Do not clean injection orifices with
the nozzle cleaning tool 0 986 611 140. Do not clean
the electrical connection of the injector with cold
cleaning agent.
1. Seal the inlet connection, return connection and
nozzle cone of the injector/nozzle holder with pro-
tective caps or cover over.
2. Use a plastic brush to remove any coarse dirt on the
injector/nozzle holder.
3. Pre-clean the injector/nozzle holder with cold clean-
ing agent.
!
Use the cleaning agent Tickopur TR 13 or a compa-
rable corrosion and coke-dissolving cleaning agent
for ultrasonic cleaning.
4. Remove the protective cap from the nozzle cone.
5. Attach the injector/nozzle holder to a suitable hold-
ing device and immerse it in the ultrasonic bath until
the nozzle retaining nut is completely covered by the
cleaning agent.
6. Set a cleaning temperature of 60°C to 70°C.
7. After approx. 15 minutes, take the injector/nozzle
holder out of the ultrasonic bath and blow dry with
compressed air.
i
After cleaning, always store injectors/nozzle holders
in a clean, closed container to prevent the injectors/
nozzle holders coming into contact with dirt par-
ticles (e.g. fluff, swarf).
i
Also heed the additional cleaning information in the
ESI[tronic] 2.0 component repair instructions.
en
|
1 689 989 188
2016-12-20

Advertisement

Table of Contents
loading

Table of Contents