Installation And Commissioning; Installation Preparation; Installation - Huawei ECC500 User Manual

Data center
Hide thumbs Also See for ECC500:
Table of Contents

Advertisement

ECC500 (Data Center)
User Manual

4.1 Installation Preparation

Safety Precautions
Tools
Table 4-1
Table 4-1 Tool requirements
Appearance

4.2 Installation

Prerequisite
Issue 06 (2020-01-06)
4

Installation and Commissioning

Wear ESD gloves to move equipment. This prevents electrostatic shock and damage to
hands.
Protect yourself from falling-down objects.
lists the required tools.
Item
Phillips
screwdriver
Flat-head
screwdriver
All tools are obtained.
The location of the equipment is determined in the rack.
Copyright © Huawei Technologies Co., Ltd.
4 Installation and Commissioning
Description
Tightens screws.
Screwdriver specifications: M3 x 100 mm or
M6 x 200 mm
Tightens screws.
Screwdriver specification: M2 x 100 mm or
M6 x 200 mm
22

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

V300r001c02

Table of Contents