4.1.6

Connection to CC-Link (intelligent device station)

■1. One-to-one connection of GOT and redundant system
(1) System configuration example
The following connection configuration examples are explained.
Control system (system A)
N/W No.:0
PC No.:0
(2) Connection method
Connect the CC-Link (intelligent device station) to the GOT.
(3) PLC Side Setting (GX Works3)
(a)
Control system (system A) PLC setting
• Module parameter
Station type
Mode
Station No.
Transmission speed
Parameter setting
4 - 44
4.1 MELSEC iQ-R Series
1)
2) 5)
4)
1) Process CPU
2) Redundant function module
3) Tracking cable
4) CC-Link(ID)
5) CC-Link IE Filed Network Master/Local module
12. CC-Link CONNECTION (INTELLIGENT DEVICE STATION)
Item
N/W No.:0
GOT
PC No.:2
CC-Link cable
1)
2) 5)
3)
Set value
Master station
(Redundant function is supported)
Remote net (Ver.2 mode)
0 (fixed)
156kbps
Parameter (fixed)
(Redundant system: Pair No.1)
Standby system
(system B)
N/W No.:0
PC No.:1
4)