Bosch BPT-S 5 Hybrid Installation Manual page 250

Solar inverter with integrated battery
Hide thumbs Also See for BPT-S 5 Hybrid:
Table of Contents

Advertisement

Available languages

Available languages

106 | External cabling
Storage system | Installation manual
6. Secure each of the cables connected with two
cable ties on the strain relief under the terminal
strip
7.3:
Strain relief
7. Connect the energy meter: Connect the RS485
cable to RS485 on the storage system housing
The energy meter and the RS485 plug are included
in the scope of delivery.
CAN
V-CAN
Open
LAN
7.4:
Terminals on the storage system housing
PIN
Configuration, see the back of the meter cover
for wiring diagram
5
Ground - Ground (27) on the energy meter
3
+ (terminal B (24) on the energy meter) 120 Ω
between A and B on the energy meter
8
- (terminal A (23) on the energy meter)
8. Connect the RS485 cable to the energy meter
9. Connect the terminating resistor to the V-CAN
terminal on the storage system housing (on
delivery of the storage system, a terminating
resistor is inserted in this terminal.)
RS485
USB
Bosch Power Tec GmbH
English
USB

Advertisement

Table of Contents
loading

Table of Contents