Connecting To The Internal Distribution Box - Bosch BPT-S 5 Hybrid Installation Manual

Solar inverter with integrated battery
Hide thumbs Also See for BPT-S 5 Hybrid:
Table of Contents

Advertisement

Available languages

Available languages

80 | Installation
Storage system | Installation manual
6.20:
Install the string inverter and tighten the screws
The string inverter is fitted.
6.9.2

Connecting to the internal distribution box

Info
Observe the maximum tightening torque when
connecting the cables (Tightening torques overview,
p. 139)
Procedure
1. Connect the 2-core backup cable (1) to the upper
terminals 5 and 6 on the internal distribution box
2. Connect the 4-core intermediate circuit cable (DC
link) (2) to the upper terminals 1-4 on the internal
distribution box
English
Bosch Power Tec GmbH

Advertisement

Table of Contents
loading

Table of Contents