Flow Chart - Bosch BPT-S 5 Hybrid Installation Manual

Solar inverter with integrated battery
Hide thumbs Also See for BPT-S 5 Hybrid:
Table of Contents

Advertisement

Available languages

Available languages

English
No.
Activity
1
Delivery and
transport
2
Installation
3
External cabling
4
Commissioning
Bosch Power Tec GmbH
4

Flow chart

This flow chart provides information and guidance on
the individual steps that are required to install the
storage system. Each step is explained in greater
detail in the chapters stated.
Steps
– Transport to the installation
location
– Unpack
– Install the feet
– Position
– Remove external parts
– Install the anti-tilt device
– Install and connect the
components
– Install the external parts
– Remove the shielding plate
– Connect to the in-house grid
– Connecting external
components
– Install the shielding plate
– Commissioning assistant
Flow chart | 49
Reference to detailed
explanation
Delivery and positioning,
p. 51
Installation, p. 57
External cabling, p. 101
Commissioning, p. 111
Storage system | Installation manual

Advertisement

Table of Contents
loading

Table of Contents