Bosch BPT-S 5 Hybrid Installation Manual page 207

Solar inverter with integrated battery
Hide thumbs Also See for BPT-S 5 Hybrid:
Table of Contents

Advertisement

Available languages

Available languages

English
Bosch Power Tec GmbH
2. At the top of the housing, use the 5 mm Allen key
to remove the two M6 Allen screws
6.6:
Remove the screws at the top
3. At the bottom of the door channel: Use the 5 mm
Allen key to remove the two M6 Allen screws
4. In the door channel, under the EMS: Use the 4 mm
Allen key to remove the two M5 Allen screws
Installation | 63
Storage system | Installation manual

Advertisement

Table of Contents
loading

Table of Contents