Safety Signs On The Device; Safety Equipment - Bosch BPT-S 5 Hybrid Installation Manual

Solar inverter with integrated battery
Hide thumbs Also See for BPT-S 5 Hybrid:
Table of Contents

Advertisement

Available languages

Available languages

18 | Safety
13 min
Storage system | Installation manual
2.4

Safety signs on the device

Danger of electric shock
Warning that the batteries may leak
Risk of electric shock
Discharge time is 13 minutes
Read the installation instructions and operating manual
Do not drill the housing or batteries
2.5

Safety equipment

An electrician must install the following safety
equipment:
DC isolator The DC isolator cuts off the energy flow
between the PV system and the storage system. It
must be installed between the PV system and the
storage system in accordance with the wiring
diagram (Example for in-house connection, p. 141).
Emergency switch (for emergency power supply
only): According to EN 60204-1, an emergency
switch must be installed between the storage
system and the in-house grid. The position of the
switch is shown in the wiring diagram. The
emergency switch cuts off the energy flow between
the storage system and the in-house grid.
English
Bosch Power Tec GmbH

Advertisement

Table of Contents
loading

Table of Contents