4. Drill holes of appropriate sizes in the AC cabinet cover and install cable glands to ensure
that IP protection is established.
Individual cabling (single phase)
5. Route the cables inside the AC cabinet.
6. Connect the cables to the correct fuse base terminals in the AC cabinet. Tighten the
connections.
Note:
You can connect the fuse base without terminating the LV AC cables.
Electrical installation 45
Multicore cabling (3-phase)
11