Komatsu ecot3 Operation And Maintenance Manual page 186

Hide thumbs Also See for ecot3:
Table of Contents

Advertisement

OPERATION
OPERATION
4. Loosen camera mounting bolt (5) and adjust camera installing
angle (A) so that the side of camera matches the edge of
bracket (B).
REMARK
Part of the machine is shown on the monitor screen.
5. After adjusting, tighten bolt (5).
Tightening torque: 11.8 to 14.7 Nm (1.2 to 1.5 kgm, 8.7 to 10.8
lbft)
6. Install covers (1) and (2).
MACHINE OPERATIONS AND CONTROLS
MACHINE OPERATIONS AND CONTROLS
3 - 129

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pc220lc-8Pc200lc-8Pc220-8Pc200-8Pc220-85001

Table of Contents