Checking After Commissioning; Turning Up The Pedal - Huawei FusionCol8000-E140 Quick Manual

Modular indirect evaporative cooling system
Table of Contents

Advertisement

FusionCol8000-E140 Modular Indirect Evaporative
Cooling System
Quick Guide (2021, Ireland)
Procedure
Step 1 Tap Shutdown on the home screen of the display module. A warning is displayed,
indicating whether to shut down the unit.
Step 2 Tap Confirm. If the device is successfully shut down, the system displays a
message, indicating that the command is successfully triggered.
Step 3 Turn off the power switch on the unit.
----End

2.8 Checking After Commissioning

Table 2-4 Commissioning checklist
Item
The foreign matter on the water pan and bottom plate is
cleaned up.
The air filters are correctly installed according to the air
flow direction on the frame.
Water in the water pan is drained smoothly.
All adjustable side panels have been installed.

2.9 Turning Up the Pedal

Step 1 After you finish operations behind the No. 2 maintenance door, turn up the pedal
and secure it.
----End
Issue 02 (2023-08-03)
Copyright © Huawei Digital Power Technologies Co., Ltd.
2 Power-On and Commissioning
Check Result
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
62

Advertisement

Table of Contents
loading

Table of Contents