Connecting Cables; Precautions; Putting Down The Pedal - Huawei FusionCol8000-E140 Quick Manual

Modular indirect evaporative cooling system
Table of Contents

Advertisement

FusionCol8000-E140 Modular Indirect Evaporative
Cooling System
Quick Guide (2021, Ireland)
Step 7 Remove the air filter cover and secure the air filter.
Step 8 Close all the maintenance doors and install the air filter on the air vent on the
outdoor side.
----End

1.4 Connecting Cables

1.4.1 Precautions

1.4.2 Putting Down the Pedal

Step 1 When entering the No. 2 maintenance door, lift the pedal fastener and slowly put
down the pedal.
Issue 02 (2023-08-03)
Connections of all power cables, control cables, and ground cables must
comply with local electrical regulations, and the cable specifications should
comply with local cabling specifications.
For details about the maximum current, see the nameplate of the unit.
Check that the input voltage and frequency of the active power supply meet
the requirements of the unit.
Only trained and qualified personnel are allowed to connect cables.
Before connecting cables, use a multimeter to measure the input voltage and
ensure that the power supply is disconnected.
All units must be reliably grounded before power-on.
Stay away from the equipment when preparing cables to prevent cable scraps
from entering the equipment. Cable scraps may cause sparks and result in
personal injury and equipment damage.
Wear personal protective equipment and use dedicated insulated tools to
avoid electric shocks or short circuits.
Cables should be securely connected and free of contact with components,
such as the fan.
When laying out cables, ensure that the power cables and signal cables are
routed and bound separately.
Cable colors in this document are for reference only. The actual cable colors
may vary.
Copyright © Huawei Digital Power Technologies Co., Ltd.
1 System Installation
25

Advertisement

Table of Contents
loading

Table of Contents