Installing The Equipment; Unpacking And Checking - Huawei FusionCol8000-E140 Quick Manual

Modular indirect evaporative cooling system
Table of Contents

Advertisement

FusionCol8000-E140 Modular Indirect Evaporative
Cooling System
Quick Guide (2021, Ireland)
Table 1-4 Cable terminal requirements
Item
Active input
L1/L2/L3/N
PE
Standby input
L1/L2/L3/N
PE

1.3 Installing the Equipment

1.3.1 Unpacking and Checking

Context
Move the unit closest to the installation position before unpacking it to facilitate
movement and avoid damage.
Procedure
Step 1 Check that the outer package of the unit is intact. If any damage is found, notify
the carrier immediately.
Step 2 Check whether the exterior of the unit is in good condition and free of collision
marks or scratches. If any damage is found, notify the carrier immediately.
Step 3 Check the type and quantity of fittings against the packing list. If some fittings are
missing or do not comply with the models in the packing list, record the
information and contact the supplier immediately.
----End
Issue 02 (2023-08-03)
Connection
Method
Crimped cord end
terminal
Crimped OT
terminal
Crimped cord end
terminal
Crimped OT
terminal
NO TE
During movement, do not tilt it for 90°.
NO TE
● Do not remove the plastic packing materials before connecting pipes and cables to
prevent dust and other foreign matter from entering the unit.
● After pipes and cables are connected, take dustproof and anti-condensation measures in
a timely manner based on site requirements.
NO TE
After the check is complete, keep the accessories properly.
Copyright © Huawei Digital Power Technologies Co., Ltd.
Terminal/Bolt
Specifications
2
10 mm
M8
2
10 mm
M8
1 System Installation
Torque
-
26 N·m
-
26 N·m
10

Advertisement

Table of Contents
loading

Table of Contents