Install The Base - Terra 60; Ac Cables Preparation - Terra 60; Install The Base Cover - Terra 60 - ABB 2 Series Operation And Installation Manual

Table of Contents

Advertisement

Installation
6.1.6

Install the base - Terra 60

D
A
B
C
6.1.7

AC cables preparation - Terra 60

NOTE
The length of the cable lug can change, depending on the model of the EVSE. Think about the
length of the cable lug when you calculate where to cut the cables.
A
X
X
D
B
C
6.1.8

Install the base cover - Terra 60

B
• Put the base (A) on the foundation (B) and use it as a
• Drill the 6 holes (C) in the foundation
• Use the bolts (D) to install the base on the foundation.
• Make sure that the cables are fully guided through the
• Install the cable glands for each cable
C
• Cut the cables L1, L2, L3 and N (B) to the correct length (X).
• Attach the cable lugs to the cables:
X
X
B
• Install the base covers (B)
• Screw the 4 fastners (A)
A
drilling template
cable glands in the base.
(X) = 235 mm is the distance between the cable gland
plate (C) and the center of thet connection terminal (A) on
the main switch (D).
Cable lug dimension - Terra 60
W
25 mm
H
14 mm
Hole
for a M10 bolt Ø10.5 mm
47
H

Advertisement

Table of Contents
loading

This manual is also suitable for:

Terra 360 -ceTerra 60-ce

Table of Contents