Figure 2-5: Flow chart
●
Unpacking: see section
●
Rail Kit Assembly: see section
●
Insert Chassis into Rack: see section
●
CMA Assembly: see
●
Pull out Chassis from Rack: see
●
Drive Assembly: see
●
Push Chassis into Rack: see section
2.3
Check the Installation Environment
●
Check the rack or mounting bracket: ensure that rack or mounting bracket should be able to hold eight times
of the total weight of equipment.
●
Check the cooling space: ensure thermal dissipation space is enough.
●
Check space clearance: ensure at least 1.5 m (5 ft) clearance in front of the rack (the cold aisle). This will
allow to fully pull out the chassis without obstruction.
●
To install the systems in shallower third-party racks other than Lenovo racks, see Appendix for instructions to
adjust the rail kit.
2.4
Unpacking
Follow the following steps to unpack the product:
1.
Inspect the package to make sure that it has not been damaged.