Figure 2-5: Flow chart
Unpacking: see section
Rail Kit Assembly: see section
Insert Chassis into Rack: see section
CMA Assembly: see
Pull out Chassis from Rack: see
Drive Assembly: see
Push Chassis into Rack: see section
2.3

Check the Installation Environment

Check the rack or mounting bracket: ensure that rack or mounting bracket should be able to hold eight times
of the total weight of equipment.
Check the cooling space: ensure thermal dissipation space is enough.
Check space clearance: ensure at least 1.5 m (5 ft) clearance in front of the rack (the cold aisle). This will
allow to fully pull out the chassis without obstruction.
To install the systems in shallower third-party racks other than Lenovo racks, see Appendix for instructions to
adjust the rail kit.
2.4

Unpacking

Follow the following steps to unpack the product:
1.
Inspect the package to make sure that it has not been damaged.
2.4
2.5.1
2.5.2
2.6
2.7.1
2.7.2
2.7.3
13