The rails and necessary hardware are supplied by Lenovo.
Tower installation
To install the unit in a tower configuration:
Step 1.
Place the UPS on a flat, stable surface, in its final location.
Step 2.
Always keep 150 mm of free space behind the UPS rear panel.
Step 3.
If installing additional units, place them next to the UPS in their final location.
• Adjustment of the orientation of the LCD panel and of the logo.
20
3U Rack or Tower UPS RT5.0kVA and RT6.0kVA Installation and User's Guide