Replacing The Communication Card; Ups Power Management Suite - Lenovo RT5.0kVA Installation And User Manual

3u rack or tower ups
Table of Contents

Advertisement

4. Plug the RPO connector into the back of the UPS and fix the screws.
5. Connect and restart the UPS.
6. Open the external remote shut down contact to test the function.
Note: Always test the RPO function before applying your critical load to avoid accidental load loss.

Replacing the communication card

Follow these steps to replace the UPS Network Management Card.
Step 1.
Turn off the UPS.
Step 2.
Disconnect the network cable.
Step 3.
Remove the connector panel blank (
Step 4.
Insert the UPS Network Management Card into the slot.
Step 5.
Secure the panel by tightening the two screws.

UPS Power Management suite

The UPS ships with the UPS Power Management suite. It operates on a computer running Windows
or Linux, plugged into the UPS output.
To begin installing, see the UPS Power Management suite CD.
The UPS Power Management suite provides real-time graphics of UPS power data. It also gives you a
complete record of critical power events, and it notifies you of important UPS or power information.
If there is a utility power outage and the UPS battery power becomes low, the UPS Power Management suite
can attempt to shut down your computer before the UPS shutdown occurs.
34
3U Rack or Tower UPS RT5.0kVA and RT6.0kVA Installation and User's Guide
), which is secured by two screws.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rt6.0kva5594-5kx5594-6kx5594-6bx

Table of Contents