Download Print this page

Sharp 00ZSF1116/A1E Service Manual page 86

Advertisement

9 Check the drum current in the front frame side and the rear frame
side. Difference between the front frame side current and the rear
frame side current must be within 7.0 uA.
a. Turn on the main switch and execute simulation 8-02. (MTHV
is turned on for about 30 sec.)
b. Measure the drum current in the front frame side and in the
rear frame side.
When the microswitch is OFF: The drum current in the front
frame side is displayed.
When the microswitch is ON: The drum current in the rear
frame side is displayed.
(OFF)
N/C
N/O COM
c. Check that the difference between the front frame current and
the rear frame current is within 7.0 µA. If the difference ex-
ceeds 7.0 µA, the charger unit is abnormal. Replace the
charger unit in that case.
2) Charging grid voltage adjustment
Before this adjustment, check that the photoconductor drum, and
developing unit, and the charger (MC/TC) units are attached.
(Measurement and adjustment at the high voltage PWB check point)
1 Remove the rear cabinet.
2 Set the digital multi meter range to DCV, and connect to the grid
voltage output check pin (GB).
3 Turn on the copier power and execute simulation 44-11.
4 Select the standard mode (A) with the magnification ratio display
Execution of simulation 44-11
Select the standard mode (A) with the magnification ratio select key.
(Reference)
(ON)
5 Use the 10-key pad to adjust so that the measurement value by
N/C
N/O COM
6 Adjust similarly in the photo mode (b), and in the toner save mode
Check the GP patch (d) after adjustment of standard (A), photo (b)
and TS (c).
GB
Sim No.
* Drum marking number 1 = SHARP
* This model performs the process correction according to the num-
3) Developing bias (BS) voltage adjustment
The developing bias voltage is measured and adjusted with the check
pin (DV BIAS) on the high voltage PWB and the control knob
(VR301).
In advance to this adjustment, check that the photoconductor drum,
the developing unit, and the charger (MC/TC) units are installed.
1 Remove the rear cover.
2 Set the digital multi meter range to DCV, and connect it to the
3 Turn on the copier power, and execute simulation 8-01.
4 During execution of the simulation, check that the developing bias
7 – 22
key on the operation panel. (The mode is displayed on the copy
quantity display.)
Display
Mode
–750 ±5V
A
Standard
–500 ±5V
b
Photo
–650 ±5V
C
TS
d
GB patch
–410V
the tester in the standard mode (A) is –750 ±5V. (Input value 1
corresponds to 5V.)
* For the voltage check, enter the value with the 10-key pad and
press the PRINT button to store it, and press the PRINT button
again and measure the voltage with the tester while copying.
(C).
Grid voltage adjustment
(Sim 44-11)
Display
Mode
Grid
A
Standard
–750±5V
b
Photo
–500±5V
C
TS
–650±5V
d
GB patch
–410V
Grid voltage check
* Drum marking number: 1 * Drum marking number: 2
Mode
8-2
Standard
–740
8-3
Photo
–480
8-4
TS
–630
Drum marking number 2 = Mitsubishi
ber of drum mark(s). With Sim 8, the grid voltage after correction
can be checked.
developing bias output check pin (DV BIAS).
output monitor voltage is –200 ±5V. If the voltage is outside the
range, adjust with the control knob (VR301).
→ GB is not adjustable.
* 1
Input value
(Input value 1
(Standard)
corresponds
to 5V.)
48
2
d (GB) is fixed.
46
46
41
Grid voltage
–770
–480
–650

Advertisement

loading

This manual is also suitable for:

Sf-1116