List Of Work For Scheduled Servicing - Canon Inner Finisher-L1 Service Manual

Table of Contents

Advertisement

List of Work for Scheduled Servicing

PR: Replacement (Periodically replaced parts) / CR: Replacement (consumable parts) / CL: Cleaning / LU: Lubrication / AD:
Adjustment / CH: Maintenance
No.
Part Name
Part Num-
ber
1
Stapler Unit
FM1-N381
2
Staple-free Sta-
FM2-B760
ple Unit
3
Paper Retainer
4
Paddle
5
Delivery Roller
6
Return Belt
7
Inlet Roller
Q'ty
Interval
1
CR/500,000
times
1
CR/30,000
times
-
-
CL/As nee-
ded
-
-
CL/As nee-
ded
-
-
CL/As nee-
ded
-
-
CL/As nee-
ded
-
-
CL/As nee-
ded
[2]
[3]
Counter
DRBL-2 >FIN-
"Removing the Stapler Unit" on
STPR
DRBL-2 >FR-
"Removing the Staple-free Sta-
STPL
ple Unit" on page 86
-
-
-
-
-
[4]
[5]
40
3. Periodical Service
Reference
page 85
-
Cleaning with wet and
tightly wrung lint-free
-
-
-
-
[1]
[6]
[7]
Remarks
paper

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents