Ips Check (For Italy Cei0-21 Grid Code Only) - Huawei 01075345 User Manual

Hide thumbs Also See for 01075345:
Table of Contents

Advertisement

SUN2000-(2KTL-6KTL)-L1
User Manual

7.2.3 IPS Check (for Italy CEI0-21 Grid Code Only)

Function
The Italy CEI0-21 grid code requires an IPS check for the SUN2000. During the
self-check, the SUN2000 checks the protection threshold and protection time of
the maximum voltage over 10 min (59.S1), maximum overvoltage (59.S2),
minimum undervoltage (27.S1), minimum undervoltage (27.S2), maximum
overfrequency (81.S1), maximum overfrequency (81.S2), minimum
underfrequency (81.S), and minimum underfrequency (81.S2).
Issue 10 (2023-02-13)
generates the AFCI alarm, tap Alarm management, and tap Clear on the
right of the DC arc fault alarm to clear the alarm.
Figure 7-15 Alarm management
Method 2: FusionSolar Smart PV Management System
Log in to the FusionSolar Smart PV Management System using a non-owner
account, choose Maintenance > Alarm Management, select the DC arc fault
alarm, and click Clear to clear the alarm.
Figure 7-16 Clearing alarms
Switch to the owner account with PV plant management rights. On the home
page, click the PV plant name to go to the PV plant page, and click OK as
prompted to clear the alarm.
Copyright © Huawei Technologies Co., Ltd.
7 Man-Machine Interaction
84

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents