SUN2000-(2KTL-6KTL)-L1
User Manual
Figure 7-8 Physical layout design of PV modules
----End
Scenario 2: Setting on the Solar Inverter Side (Solar Inverter Not Connected
to the Management System)
Step 1 Access the
physical layout of Smart PV Optimizers.
1.
2.
----End

7.2 Parameters Settings

Go to the Device Commissioning screen and set SUN2000 parameters. For details
about entering the Device Commissioning screen, see
To set more parameters, tap Settings. For details about the parameters, see the
FusionSolar App and SUN2000 App User Manual
code to obtain the document.
Issue 10 (2023-02-13)
Device Commissioning
Log in to the FusionSolar App. On the Device Commissioning screen, choose
Maintenance > Optimizer layout. The Optimizer layout screen is displayed.
Tap the blank area. The Identify image and Add PV modules buttons are
displayed. You can use either of the following methods to perform operations
as prompted:
Method 1: Tap Identify image and upload the physical layout template
photo to complete the optimizer layout. (The optimizers that fail to be
identified need to be manually bound.)
Method 2: Tap Add PV modules to manually add PV modules and bind
the optimizers to the PV modules.
Figure 7-9 Physical layout design of PV modules
Copyright © Huawei Technologies Co., Ltd.
screen on the FusionSolar App to set the
B Device
. You can also scan the QR
7 Man-Machine Interaction
Commissioning.
73

Hide quick links: