4.3.2 E800-E
With the E800 inverters, the status can be monitored and controlled with certain special
SLMP Link registers.
In order for this to be possible, the PLC function of the inverter must be activated
Link Register
Parameter
Inverter Status
_________________________________________________________________________
Document: Quickstart_IoTGateway_EN
Mitsubishi Electric Europe B.V.
Rev: 001G
Date: 01/02/2022
34