Lifting The Machine; Hauling The Machine - Toro e-Dingo 500 Operator's Manual

Compact tool carrier
Hide thumbs Also See for e-Dingo 500:
Table of Contents

Advertisement

5.
Tow the machine as required using the tie-down
locations.
6.
Clean and install the gear and cover for each
gearbox to resume normal operation.
7.
Torque the screws to 2.8 to 3.4 N∙m (25 to 30
in-lb).
8.
Add gear oil to each motor; refer to
the Drive-Motor Gear Oil (page

Lifting the Machine

Remove any attachments and lift the machine using
the 4 lift points.
Do not exceed a 30-degree angle when lifting the
machine; use the minimum chain lengths provided
below.
Changing
32).
1. Chain length for front lift point (2)—155 cm (61 inches)
2. Chain length for rear lift point (2)—80 cm (31-1/2 inches)

Hauling the Machine

Use a heavy-duty trailer or truck to haul the machine.
Use a full-width ramp. Ensure that the trailer or truck
has all the necessary brakes, lighting, and marking as
required by law. Please carefully read all the safety
instructions. Knowing this information could help
you or bystanders avoid injury. Refer to your local
ordinances for trailer and tie-down requirements.
22
Figure 20
g388352

Advertisement

Table of Contents
loading

This manual is also suitable for:

2221922219g

Table of Contents