Installation Verification - Huawei NetCol8000-C070 Quick Manual

In-room chilled water smart cooling product
Hide thumbs Also See for NetCol8000-C070:

Advertisement

1. Remove the cap front panel using a Phillips
screwdriver. Place the cap on the top of the
cabinet.
3. Secure the cap front panel to the frame, and adjust the
angle of the front panel blade.
5

Installation Verification

Check Item
Expected Result
The cabinet is installed properly, without any tilt. The cabinet is
Cabinet
secured to the base by using bolts. The foreign matter inside
the cabinet, such as cable ties and stubs, has been cleaned up.
The fan of the downflow unit is lowered and secured to the
Fan
cabinet bottom plate. The fan has no foreign matter inside.
The foreign matter inside the water pan is cleaned up.
Water pan
(Optional)
The electric heater is secured.
Electric heater
Differential
The cable ties are securely tightened around pressure tubes.
pressure
There is no foreign matter in pressure tubes. The pressure
switch
tubes show no obvious bends.
Exhaust valve
The exhaust valve is closed.
Drainage valve The drainage valve is closed.
The air filter is correctly installed according to the airflow
Air filter
direction marked on the frame.
The chilled water valve and its actuator are securely installed.
The chilled water connector joints have been wrapped with
thermal insulation foam, and no metal or hose are exposed.
Chilled water
Cables are securely connected to the chilled water valve and its
valve
actuator. Cables to the chilled water valve and its actuator are
secured. Check that the manual button on the actuator is reset
(the button bounces up).
2. Secure the left and right sides of the cap
using six M5 screws and the front and
rear of the cap using four M5 screws.
24
Actual Result
□Passed □Failed
□Passed □Failed
□Passed □Failed
□Passed □Failed
□Passed □Failed
□Passed □Failed
□Passed □Failed
□Passed □Failed
□Passed □Failed