Installation; Installation Precautions; Testing Safety Functions - ABB INCA 1EC Tina Manual

Emergency stop buttons, safety stop button
Hide thumbs Also See for INCA 1EC Tina:
Table of Contents

Advertisement

4

Installation

Mount and fit INCA Tina in the cabinet.
Attach and tighten the M22 nut.
See max. tightening torque in chapter "Technical data".
Connect the terminal block.
4.1

Installation precautions

Warning! All safety functions shall be tested before starting up the system.
4.2

Testing safety functions

After each step the status of the input can be read on the monitoring device.
Steps for testing
1. Interrupt the DYNlink safety
circuit before the unit to be
tested
2. Close the DYNlink safety circuit
3. Interrupt the DYNlink safety
circuit (press the button)
2TLC172163M0201 Rev.F
LED indication
Green/red flashing
Green
Red
DYNlink signal output
Shall go low
Shall generate a DYNlink
signal
Shall go low
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Inca 1 tina v2Inca 1s tina v2

Table of Contents