GE AMX-4+ Technical Manual page 7

Hide thumbs Also See for AMX-4+:
Table of Contents

Advertisement

GE MEDICAL SYSTEMS
REV 5
If you have any comments, suggestions or corrections to the information in this document,
please write them down, include the document title and document number, and send them to:
CERTIFIED ELECTRICAL CONTRACTOR STATEMENT
All electrical installations that are
preliminary to positioning of the
equipment at the site prepared for
the equipment shall be performed by
licensed electrical contractors. In
addition, electrical feeds into the
Power Distribution Unit shall be
performed by licensed electrical
contractors. Other connections be
tween pieces of electrical equipment,
calibrations, and testing shall be
DAMAGE IN TRANSPORTATION
All packages should be closely
examined at time of delivery. If
damage is apparent, have notation
damage in shipment" written on
all copies of the freight or express
bill before delivery is accepted or
signed for" by a General Electric
representative or a hospital receiv
ing agent. Whether noted or
concealed, damage MUST be
reported to the carrier immediately
GENERAL ELECTRIC COMPANY
MEDICAL SYSTEMS
MANAGER – INFORMATION INTEGRATION, AMERICAS W–622
P.O. BOX 414
MILWAUKEE, WI 53201–0414
performed by qualified GE Medical
personnel. The products involved
(and the accompanying electrical
installations) are highly sophisti
cated,
and
special
competence is required. In perform
ing all electrical work on these
products, GE will use its own
specially trained field engineers. All
of GE's electrical work on these
products
will
comply
upon discovery, or in any event,
within 14 days after receipt, and the
contents and containers held for
inspection by the carrier. A trans
portation company will not pay a
claim for damage if an inspection is
not requested within this 14 day
period.
Call Traffic and Transportation,
Milwaukee, WI (414) 827-3449 /
v
(MODEL 2169360, 2236420 & 2275938 SERIES)
DIRECTION 2173225-100
requirements of the applicable elec
trical codes.
engineering
The purchaser of GE equipment
shall only utilize qualified personnel
(i.e., GE's field engineers, personnel
of third party service companies with
equivalent training, or licensed elec
tricians) to perform electrical servic
with
the
ing on the equipment.
8*285-3449
damage is found. At this time be
ready to supply name of carrier,
delivery date, consignee name,
freight or express bill number, item
damaged and extent of damage.
Complete instructions regarding
claim procedure are found in
Section S" of the Policy &
Procedure Bulletins.
AMX-4+ SERVICE
immediately
after
6/17/94

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2169360 series2236420 series2275938 series

Table of Contents