6 Performance tests

6.2 How to run performance tests

6.2
How to run performance tests
Introduction
This section describes the general procedure for running performance tests. Details of
the individual tests including purpose and required materials are given in the method
notes for each test method. An example is shown below.
Procedure
Performance tests are provided with the instrument configuration in UNICORN software.
Follow the general steps below to run a performance test. Detailed requirements and
procedures are shown on the screen when the test is run.
Step
1
122
NOTICE
Valve module tests and other leakage tests expose the system to
pressures close to the system pressure limit by running the system
pumps at a low flow rate with the flow path closed at some point.
Ensure that the system pressure limit is set to the default value
(2.0 MPa) before running performance tests.
Action
Open System Control in the UNICORN software if it is not already open.