Environmental Conditions; Installation - ABB Sace Emax 2 Installation, Operation And Maintenance Instructions For The Installer And The User

Low voltage air circuit-breakers
Table of Contents

Advertisement

4 - Environmental conditions

5 - Installation

Warnings and precautions
before the installation
Mounting of the fixed circuit-
breaker
Mounting anti-insertion locks Before installing the fixed part it is necessary to fit the lock that prevents the insertion of circuit-breakers
20 | © 2022 ABB | 1SDH000999R0002 - ECN000232533
Details related to this chapter are available in the manual
available on the website ABB library.
The following warnings and precautions must be respected before installing the circuit-breaker in the
switchgear
WARNING!
• Disconnect the power from the circuit-breaker (power circuit and auxiliary circuits)
• Make sure the circuit-breaker is disconnected from all sources of energy
• Switch the circuit-breaker to the open position with springs discharged
NOTE: The trained personnel in charge of handling and lifting must use appropriate safety
equipment.
Fix the circuit-breaker to a horizontal surface using four M5 x 25 screws (see Figure 43). Lock the screws
with tightening torque 4 Nm - 35 lb in.
Figure 43
into fixed parts with different electrical characteristics (see Figure 44).
Information on the assembly is available on the website http://www.abb.com/abblibrary/
DownloadCenter/, in particular with the kit sheet 1SDH000999R0701.
C -N
C -N
.2
.2
B-
B-
12
12
E1
E1
10
10
08
08
06
06
02
02
Figure 44
1SDH001330R1002
L
L
.2
.2
E1
E1
12
12
10
10
08
08
06
06
16
16
ABB | SACE Emax 2
(Emax 2 engineering manual)
L
L
.2
.2
1 2
1 2
E 1
E 1
1 0
1 0
0 8
0 8
0 6
0 6
-N
-N
1 6
1 6
B -C
B -C
1 2
1 2
.2
.2
E 1
E 1
1 0
1 0
0 8
0 8
0 6
0 6
0 2
0 2
Management operations | 5 - Installation

Advertisement

Table of Contents
loading

This manual is also suitable for:

E1.2E1.2-a

Table of Contents