Putting into service and maintenance

1 - Putting into service

Introduction The general check is necessary:
Terminal wiring Indication of cable size for wiring terminals:
47 | © 2022 ABB | 1SDH000999R0002 - ECN000232533
• when the circuit-breaker is put into service for the first time
• after prolonged inactivity of the circuit-breaker
HAZARD! RISK OF ELECTRIC SHOCK! Test the circuit-breaker with all switchgear apparatus
de-energized.
IMPORTANT: The verifications involve procedures which must only be performed by
persons skilled in the electrical field (IEV 195-04-01): person with sufficient training and
experience to enable him or her to perceive risks and avoid the dangers potentially
created by electricity).
8mm
Max O 3,3mm
0.31"
Max O , 3
0 1 "
2
0,5 2,5mm
8mm
Max O 3,3mm
0.31"
Max O , 3
0 1 "
2
0,5 1,5mm
Figure 69
2
Putting into service and maintenance | 1 - Putting into service