ABB Sace Emax 2 Installation, Operation And Maintenance Instructions For The Installer And The User page 20

Low voltage air circuit-breakers
Table of Contents

Advertisement

18 | © 2022 ABB | 1SDH000999R0002 - ECN000232533
Continued from the previous page
4.
Extract the disconnection crank from its housing See Figure 33.
5.
Press the lock pushbutton and fit the handle into the moving part. In this phase, the moving part
will still be in the DISCONNECT position. See Figure 34.
Figure 33
6.
Keep breaker pushed. Turn handle clockwise until pushbutton projects and signaling device
indicates that circuit-breaker is in position TEST. See Figure 35.
Figure 35
7.
Press the lock button and then rotate the crank clockwise until the button comes out and the
indicator shows that the circuit-breaker is in the CONNECT position. See Figure 36.
Figure 36
2
Figure 34
1
2
2
ABB | SACE Emax 2
1
Continued on the next page
Management operations | 3 - Description
1

Advertisement

Table of Contents
loading

This manual is also suitable for:

E1.2E1.2-a

Table of Contents