Samsung Smart MBS RRH-C2A Installation Manual page 75

Table of Contents

Advertisement

Category
Feeder
Line status
Various
TAG Status
General
Opinion
© SAMSUNG Electronics Co., Ltd.
Table 2.8 Construction Status Checklist (continued)
Check Items
Feeder Line installation and
fixing status
ANT installation and
connection status
Connection and end
processing status
Feeder Line tag
Power cable tag
Ground table tag
Attachment status of the
label for the real-name
construction system
- Indoor: wall side of the gate
side
- Outdoor: inside of the
cover of the distribution box
Cable duct, bolt connection
status
Feeder line Entrance end
processing status (Outdoor)
Status of inside/outside of
the system and vicinity of the
base station
Smart MBS RRH-P4 Installation Manual/Ver.2.0
Criteria
View, consistency,
bending
Visual inspection
(ANT stick shaking status)
View, consistency
Visual inspection
(Content: Length, LOSS
value, position)
Visual inspection
Visual inspection
Visual inspection
(size, material, etc.)
Visual inspection
Visual inspection
(Checking back side
Connection)
Visual inspection
Result
Remarks
Pass
Fail
2-43

Advertisement

Table of Contents
loading

Table of Contents