3) Attach the junction box (breakout point) to the pole using a stainless steel band.
Tie the cables to the pole 500 mm below and 500 mm above the box.
(To stabilize the cables near the junction box's cable input and output holes.)
© SAMSUNG Electronics Co., Ltd.
Cable Tie
Power & Optic Cable
(to. RRH-C2A)
Junction Box
(Breakout Point)
Hybrid Cable
(from. DU Cabinet)
Cable Tie
Figure 2.37 Remaining length of Hybrid cable (2)
Smart MBS RRH-P4 Installation Manual/Ver.2.0
500 mm
Stainless steel Band
Pole
Stainless steel Band
500 mm