Figure 2.17 Peeling Off The Hybrid Cable Sheath - Samsung Smart MBS RRH-C2A Installation Manual

Table of Contents

Advertisement

CHAPTER 2. Installation of RRH-C2A
9) From the inside of the cabinet, pull the optic cable to the right side of the system and
attach temporarily with a cable tie.
10) Using a flat-head screwdriver (-, 1x100), turn the RRH power terminal's screw counter-
clockwise twice to 3 times.
11) Insert the power cable to the terminal according to its use and polarity, then fasten the
screw.
12) Bind two cables (-48 V, RTN) at 100 mm from the terminal using a cable tie.
13) Bury the optic cable following the system's inner-right wall up to the UADU#0 side
and bind using a cable tie.
14) Connect the connector of the optic cable to UADU's designated port. (Loop the optic
cable's excess length respecting the bending radius (R=110 mm), and arrange it at the
bottom of the DC power terminal. Be careful not to damage the optic cable during
other works.)
1
1) Using a knife, peel off the heat shrink tube
that binds the cables together.
3
Hybrid Cable Sheath
3) Peel off the hybrid cable's sheath.
2-24
Knife
Heat Shrink Tube

Figure 2.17 Peeling off the Hybrid Cable Sheath

2
Hybrid Cable Sheath
Peeling Wire
2) Pull the peeling wire to cut the hybrid cable's
sheath.
4
4) Peel off the aluminum foil wrapped around the
inner cable.
© SAMSUNG Electronics Co., Ltd.

Advertisement

Table of Contents
loading

Table of Contents