4 SETUP AND PROCEDURE BEFORE STARTING THE OPERATION

4.2 Procedure Before Starting the Operation

Module mounting
Wiring
Intelligent function module switch setting
4
Execution of auto tuning
4 - 2
Downloaded from
ManualsNet.com
The figure below shows the steps that should be followed before starting the Q64TC
operation.
Start
Mount the Q64TC in the specified slot.
Wire the Q64TC.
Perform settings using the GX Developer
(see Section 4.5)
Perform auto tuning to set PID constants.
Use the GX Configurator-TC?
No
Initial setting
Using the FROM/TO commands, create
a sequence program for writing initial values.
Programming
Create and check a program using the
FROM/TO commands.
Warmup operation
(when Q64TCTT(BW) is used)
Perform warmup operation about 15
minutes before starting operation.
Operation
POINT
When using the Q64TCTT(BW) which uses a thermocouple as a temperature
sensor, perform warmup operation about 15 minutes before starting operation to
make temperature compensation properly.
search engine
Yes
Initial setting
Perform the initial setting using the GX
Configurator-TC (see Section 5.4).
Perform auto
No
refresh setting?
Auto refresh setting
Perform the auto refresh setting using
the GX Configurator-TC (see Section 5.5).
Programming
Create and check a program without using the
FROM/TO commands.
MELSEC-Q
Yes
4 - 2