Chapter 1 Installation Preparations; About This Chapter; Personnel Requirements; Requirements For Project Supervisor - Huawei BTS3802C Installation Manual

Antenna & feeder system
Table of Contents

Advertisement

Installation Manual -Antenna & Feeder System Installation
BTS3802C & RRU

Chapter 1 Installation Preparations

Note:
This chapter introduces the preparations related to the installation of antenna & feeder system only.
Other preparations, such as technical document preparations, installation environment check,
engineering schedule and kickoff coordination and unpacking inspections, are the same as those of
other Mini NodeB. For details, please refer to "Chapter 1 Installation Preparations" in BTS3802C
WCDMA Mini NodeB Installation Manual – Equipment Installation.

1.1 About This Chapter

This chapter describes the installation preparations of antenna and feeder system,
including:

Personnel Requirements

Preparation Tasks for Different Installation Roles
Tools & Instruments Preparation
Testing Antenna & Feeder Equipment
Adding Feeder Connector
Assembling Antenna
1.2 Personnel Requirements
The antenna & feeder system is installed by the antenna & feeder installation
personnel under the supervision of the project supervisor.

1.2.1 Requirements for project supervisor

The project supervisor should:
Be familiar with the materials, tools and methods related to the antenna & feeder
installation;
Be familiar with the installation flow and the installation methods of all the parts;
Have a strong safety consciousness.

1.2.2 Requirements for tower installer

The tower installer should:
Chapter 1 Installation Preparations
1-1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rru

Table of Contents