ABB Totalflow NGC8206 Startup Manual page 6

Hide thumbs Also See for Totalflow NGC8206:
Table of Contents

Advertisement

Precautions:
DO NOT use any type of plastic, Teflon or Teflon-lined
braided steel tubing. Use only good quality, clean stainless
steel chromatographic grade transport tubing for carrier,
calibration gas and sample lines. Use of poor quality stainless
steel tubing will generate unsatisfactory results.
Use only high purity 99.995% grade helium or better for carrier.
Sample Transport Tubing Lengths: When sample conditioning
modules are used, the sample transport tubing run can be up to
50 feet. Lengths longer than 50 feet must adhere to the rules of
calculated lag time per the Calculating Lag Time section in the
System Description chapter of the NGC8206 User's Manual.
If a sample conditioning module is not being used, the sample
transport tubing should be 1/16-inch tubing and no longer than
ten feet.
Purge all lines prior to connecting to the NGC.
Suggested calibration blend component concentrations:
Component
% Blend
N2
2.5%
CO2
1.0%
C1
89.57%
C2
5.0%
Step 6
Connect Vents, Carrier and Calibration Gas Lines
A number of installation kits are available from Totalflow. Call the number
listed on the back page of this guide for more information.
6A
Remove the sealing screws, and connect the vent tubing to the
feed-through assembly column vent 2 (CV2), column vent 1
(CV1), sample vent (SV) and gauge port vent (GPV) ports. All
four vents MUST be open. Use vent kits included with the unit.
4
Component
% Blend
C3
1.0%
iC4
0.3%
nC4
0.3%
NeoC5
0.1%
Component
% Blend
iC5
0.1%
nC5
0.1%
C6
0.03%

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents