ABB Totalflow NGC8206 Startup Manual page 4

Hide thumbs Also See for Totalflow NGC8206:
Table of Contents

Advertisement

CWE
MOUNTING
PLATE
ENCLOSURE MOUNTED
STAND-ALONE PIPE MOUNTED
Step 3
Install the Sample Conditioning Bracket and Sample
Conditioning Modules, and Connect to Feed-Through
Assembly
IMPORTANT: A particulate filter with a liquid/vapor separator sample
conditioning module is strongly recommended. Operating the NGC
without a sample conditioning module can allow liquids and particulates
to contaminate columns. This can damage the unit and void the
warranty.
If none are required, connections are made directly to the feed-through
assembly.
3A
Mount the sample conditioning bracket on the pipe.
A
A
B
B
2" Pipe
SINGLE MODULE BRACKET
2
MOUNTING PIPE
COLD WEATHER
2" MOUNTING
PIPE
A
A
MULTIPLE MODULE BRACKET
OPTIONAL
W/FLANGE
PIPE RUN MOUNTED
WALL SHELF MOUNTING
VIEW A-A
PIPE
SADDLE
WALL SHELF
VIEW B-B
U-Bolt

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents