Basic Installation - ABB Totalflow NGC8206 Startup Manual

Hide thumbs Also See for Totalflow NGC8206:
Table of Contents

Advertisement

Basic Installation

Step 1
Locate Suitable Installation Site
The NGC should be located close to the sample probe in an effort to
minimize the sample line length. See the table below for transport tubing
distances and lag times.
1/8" Transport Tubing Lag Time Considerations
Distance
10' (3.05 m)
20' (6.10 m)
30' (9.14 m)
50' (15.20 m)
100' (30.48 m)
150' (45.72 m)
200' (60.10 m)
250' (76.20 m)
300' (91.44 m)
350' (106.68 m)
380' (115.82 m)
Step 2
Mount the Unit
Mount the unit on a meter run, wall shelf, stand-alone pipe or inside a
cold weather enclosure.
NOTE: The NGC should not be connected to any section of pipeline
where cathodic protection exists.
The NGC has a grounding lug on the mounting neck of the enclosure.
This lug should be tied to a good earth ground with no smaller than
#12AWG wire.
Conditioning Module
2102023-XXX
2102023-XXX
2102023-XXX
2102024-XXX
2102024-XXX
2102024-XXX
2102024-XXX
2102024-XXX
2102024-XXX
2102024-XXX
2102024-XXX
Seconds
36
48
60
16
23
30
36
42
50
56
60
1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents