Contents Of The Bts Transportation Package; Table 4. Checklist For Contents Of The Transportation Package For The Nokia - Nokia MetroSite EDGE Installation Manual

Table of Contents

Advertisement

Remove the mounting rack
1.
2.
3.
4.
4.2

Contents of the BTS transportation package

Refer to Table 4 and Figure 1 for the contents of the transportation package for
the Nokia MetroSite EDGE Base Station.
Table 4.
Part
BTS chassis with the ordered units pre-
installed.
BTS cover
T-shaped mounting rack
Two Allen screws, M6 x 20
Cable cover
Cable cover support
Diversity cables
Safety strap
Four unit retaining screws
Spare counterparts for the unit retaining
screws
Key for BTS lock
DN991456
© Nokia Corporation
Issue 3 en
Nokia Proprietary and Confidential
All manuals and user guides at all-guides.com
Make sure that you have removed the BTS cover and prepared a clean
surface for working on the BTS.
Turn the BTS over and lay it flat on its front.
The mounting rack is attached to the back of the BTS for transportation. It
must be removed before continuing with installation. The mounting rack
can be seen in detail in Figure 7. Loosen the offset screws on the bottom
and the top of the mounting rack: on the L-beam and screws B1 and B2. Do
not remove the screws completely.
Remove the wooden spacer blocks and the mounting rack.
Checklist for contents of the transportation package for the Nokia
MetroSite EDGE Base Station
Unpacking the delivery
Notes
Shield units are installed in the slots that
are not populated with functional units
Provides the fixing base for the BTS
For fixing the BTS to the mounting rack
For cables routed out of the BTS
Mounting for the cable cover
For securing the cover to the chassis
Spare parts
Attached to the uppermost TRX guide
beam on the top of the BTS
21 (72)

Advertisement

Table of Contents
loading

Table of Contents