Preparations For Installation; Checking The Delivery; Checking The Site - Nokia MetroSite EDGE Installation Manual

Table of Contents

Advertisement

3

Preparations for installation

Before beginning installation, check the delivery, the site, and the required tools
and extra parts against the relevant checklists.
Note
The installation of the Nokia MetroSite EDGE Base Station can be carried out by
one person if units are removed before mounting the cabinet. However, it requires
at least two people to lift a BTS with its units installed.
Caution
Use only trained and authorised personnel for installing and commissioning the
Nokia MetroSite EDGE Base Station.
3.1

Checking the delivery

Before unpacking any of the packages, check that the delivery is correct. Confirm
that the delivery notes on each package agree with the order note.
3.2

Checking the site

The BTS site has been planned and prepared according to the specifications given
in Nokia MetroSite EDGE Base Station: Requirements for Installation and
Operation. Before beginning installation, check the site against these
specifications using a site preparation checklist.
If the site conditions do not conform to the checklist, stop the installation at this
stage and return to the site preparation procedures.
DN991456
© Nokia Corporation
Issue 3 en
Nokia Proprietary and Confidential
All manuals and user guides at all-guides.com
Preparations for installation
15 (72)

Advertisement

Table of Contents
loading

Table of Contents