Section 11
Testing functionality by secondary injection
11.11.4
Scheme communication logic for residual overcurrent
protection ECPSCH
Prepare the IED for verification of settings outlined in Section
Before testing the communication logic for residual overcurrent protection function ECPSCH, the four
step residual overcurrent protection function EF4PTOC has to be tested according to the
corresponding instruction. Once this is done, continue with the instructions below.
If the current reversal and weak-end infeed logic for earth-fault protection is included, proceed with
the testing according to the corresponding instruction after testing the communication logic for
residual overcurrent protection. The current reversal and weak-end-infeed functions shall be tested
together with the permissive scheme.
11.11.4.1
Function revision history
Document
revision
B
C
D
E
F
G
H
J
K
L
M
11.11.4.2
Testing the directional comparison logic function
Blocking scheme
1.
Inject the polarizing voltage 3U0 at 5% of UBase (EF4PTOC) where the current is lagging the
voltage by 65°.
2.
Inject current (65° lagging the voltage) in one phase at about 110% of the set operating current,
and switch the current off with the switch.
3.
Switch the fault current on and measure the operating time of the communication logic.
Use the TRIP signal from the configured binary output to stop the timer.
4.
Compare the measured time with the set value tCoord.
5.
Activate the CR binary input.
6.
Check that the CRL output is activated when the CR input is activated.
7.
Switch the fault current on (110% of the set operating current) and wait longer than the set
value tCoord.
8.
Switch the fault current off.
182
Product
History
revision
2.2.1
-
2.2.2
-
2.2.2
2.2.2
-
2.2.3
-
2.2.3
-
2.2.3
-
2.2.4
-
2.2.4
-
2.2.4
2.2.5
Added separate DOs for teleprotection permissive (TxPrm & RxPrm1), blocking (TxBlk &
RxBlk1) and direct trip (TxTr & RxTr1) transmit and receive signals in accordance with
61850 Ed 2.0.
No TRIP signal should appear.
© 2017 - 2021 Hitachi Power Grids. All rights reserved
1MRK 511 403-UEN Rev. K
"Preparing the IED to verify
GUID-F53CEDFF-DD1E-4FC2-A8AF-85DD40DBF71B v1
Bay control REC670
Commissioning manual
M13926-2 v6
settings".
M13926-7 v2
M13926-9 v6

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion rec670

Table of Contents