ControlMaster CM15
Universal process indicator
4.3 Mounting
ControlMaster is designed for panel mounting. For NEMA4X
protection, a panel thickness of 2.5 mm (0.1 in.) is required.
To panel-mount the indicator:
1.
Cut a hole of the correct size for the indicator in the
panel (see page 8 for dimensions).
2.
Insert the indicator into the panel cut-out.
Referring to Fig. 4.4:
3. Position the upper panel clamp A at the top front of
the case against the panel.
4. Locate the panel clamp anchor B in slot C.
5. Tighten the panel clamp anchor screw D until panel
clamp A is secured against the panel.
Caution. Do not overtighten the screw.
6. Repeat steps 3 to 5 to fit the lower panel clamp E
and panel clamp anchor F.
IM/CM/I–EN Rev. D
1
/
DIN
8
B
C
A
D
Fig. 4.4 Mounting Details
4 Installation
F
E
9