3. Connect the motor cable as follows:
If the power cable is temporarily removed from the grounding shelf, connect the motor and
input power cables except the 360° grounding, and then reinstall the grounding shelf.
Ground the shield 360° by tightening the clamp of the power cable grounding shelf onto
the stripped part of the cable (4a).
Connect the twisted shield of the cable to the grounding terminal (4b).
Connect the phase conductors of the cable to the T1/U, T2/V and T3/W terminals.
Tighten the screws to the torque given below:
Frame size
T1/U. T2/V. T3/W.
4c
4a
Notes:
The screws are of different length. Install them at correct locations.
After reinstalling the grounding shelf, you can make the 360° grounding for the cables.
EN - Quick installation and start-up guide 15
R3
N·m
2.5...4.5
4b
R4
lbf·ft
N·m
1.8...3.3
4.0
EN
HI
lbf·ft
3.0

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents